Every addition and correction stays visible. The graveyard and the edit history are both data.

  1. Microsoft – Constellation Crane restart PPA

    Added the initial record and current NRC restart milestones.

    Source
  2. Amazon – Talen Susquehanna PPA

    Added the amended 1,920 MW front-of-meter PPA record.

    Source
  3. Amazon – Energy Northwest Cascade SMRs

    Added the funded feasibility phase and separated initial from optioned capacity.

    Source
  4. Amazon – Dominion North Anna SMR exploration

    Added the exploratory North Anna MOU.

    Source
  5. Google – Kairos advanced reactor fleet

    Added the fleet umbrella and excluded the separate Hermes 2 implementation from its optioned total.

    Source
  6. Google – Elementl Power site development

    Added the three-site development funding agreement.

    Source
  7. Meta – Constellation Clinton PPA

    Added the 20-year Clinton PPA.

    Source
  8. Meta – TerraPower Natrium fleet

    Added funded and optioned Natrium units as separate capacity fields.

    Source
  9. Meta – Oklo Pike County campus

    Added the Pike County prepayment and development record.

    Source
  10. Meta – Vistra PJM nuclear PPAs and uprates

    Added the operating plant PPAs and uprates without double counting the uprate capacity.

    Source
  11. Sabey Data Centers – TerraPower Natrium collaboration

    Added the exploratory Natrium collaboration MOU.

    Source
  12. Switch – Oklo master power agreement

    Added the non-binding 12 GW master agreement as optioned capacity.

    Source
  13. Equinix – Oklo energy rights LOI

    Added the paid energy-rights LOI and future PPA conditions.

    Source
  14. Prometheus Hyperscale – Oklo PPA LOI

    Added the 100 MW non-binding LOI under the buyer's current name.

    Source
  15. Google – TVA – Kairos Hermes 2 PPA

    Added the binding Hermes 2 PPA and construction milestone.

    Source
  16. Google – NextEra Duane Arnold restart PPA

    Added the signed restart PPA while leaving Google's undisclosed MW allocation blank.

    Source
  17. Standard Power – NuScale and ENTRA1 sites

    Added the two planned SMR-powered data center sites and flagged the schedule for verification.

    Source